An inspection report that arrives with a batch of parts is only useful if it measures the dimensions the part actually needs. Three things to check before filing it.

Does it cover the critical dimensions?

Compare the report against the drawing’s tolerance callouts, not against the general block. If a critical dimension is missing, the report proves nothing about the feature that matters.

How was it measured?

A caliper reading and a CMM reading are not the same evidence. For a flatness or position callout, the method and the number of points should be stated. A report without a method is a list of numbers.

Which batch does it belong to?

The report should reference the batch or lot that actually shipped, not a template. If the report has no batch number, it cannot be traced to the parts in the box.

What to do when something is out

A dimension outside tolerance on the report is information, not a reason to reject automatically. Ask what the deviation is, what it affects, and whether the parts can be used. A supplier who reports it before shipping is worth keeping.