Engineering & Quality
Engineering & Quality
Every project begins with a review of customer drawings and specifications. We coordinate production according to project requirements and arrange appropriate inspections and quality documentation before delivery.

Process
Six steps, no shortcuts
Each step has an owner and an output. If a step cannot be completed, the project stops there rather than moving forward on an assumption.
-
01
Drawing Review
Geometry, tolerance and finish checked before quoting.
-
02
Process Selection
The process and machine matched to the part, not the other way round.
-
03
Partner Matching
A qualified supplier chosen for material, tolerance and volume.
-
04
Production Follow-up
Progress checked in the factory, not only by email.
-
05
Inspection
Dimensional and visual checks against the agreed plan.
-
06
Documentation
Reports, certificates and packing documents issued with the parts.
Inspection
What is checked,
and what you receive
Inspection scope is agreed at quotation. The list below is the default for production parts.
- First article inspection report
- In-process dimensional checks
- CMM report on request
- Material certificates
- Surface finish and appearance check
- Thread and fit gauging
- Packing and quantity verification
- Photos before dispatch on request


Traceability
Documents that travel with the batch
A part without paperwork is a part you cannot audit. Every shipment includes a packing list and quantity check; inspection and material documents are issued per project.
Inspection Report
Measured dimensions against drawing callouts, with the method noted.
Material Certificate
Issued against the batch actually used, on request.
Packing List
Quantity, packaging method and shipping marks for customs and receiving.
When something goes wrong
Problems are reported early, not explained later
If a part fails inspection, we tell you before it ships, with photos, the measured values and a proposed fix.
The options are usually rework, remaking the batch, or shipping what is usable and crediting the rest. Which one applies depends on the deviation and your assembly schedule — so we ask rather than decide alone.
This is the part of the process that buyers remember. A late part with a clear explanation costs less than a late part discovered on the line.
Want the inspection plan before you order?
Ask for it at quotation. We will write the acceptance criteria into the order.