A quote request with a drawing attached still takes a day of emails if the drawing is missing the information that decides the price. Six items cover it.

1. A drawing with tolerances

PDF is fine. A STEP model alone is not — a model carries nominal geometry and no tolerance, so every critical dimension has to be guessed.

2. Material and finish

Grade, not just “aluminium”. Finish, not just “anodized” — clear, black or colour, and whether the finish is decorative or functional.

3. Quantity

The first order and the annual volume, if they differ. Setup cost per piece depends on the batch, and a supplier quoting 10 pieces will quote differently from one quoting 10,000.

4. Target date

A date, not “as soon as possible”. It decides whether the part is machined in-house or queued behind another job.

5. Inspection requirement

Whether a first article report, a CMM report or a material certificate is needed. Inspection is quoted, and an unbudgeted one shows up as a surprise later.

6. The application

One sentence on what the part does. It is the fastest way for a supplier to spot a design that will not work before the quote is issued.